RFI (Ready for Installation) Survey of Individual & Sharing sites.
Installation of BTS Cards and internal cabling of BTS.
Termination of Jumper between BTS and Feeder
Power termination of BTS and IDU Equipments.
Azimuth & degree check of GSM & Microwave.
Alignment of Microwave between Near-end & Far-end.
Installation & Routing of Feeder and Connector making of Feeder.
Installation of Microwave (1+0 & 1+1), GSM.
Routing of IF cable and making connector of IF cable.
Transmission rack Installation.
Qualifications
Only shortlisted candidates will be contacted.
Visit http://www.kenyan-jobs.com/ for many more jobs in Kenya
No comments:
Post a Comment